index — search projects, studio, contact and news
News Close project
The Museum of Modern Art Renovation & Expansion

The Museum of Modern Art Renovation & Expansion

New York, NY

The renovation and expansion of the MoMA allows the Museum to exhibit significantly more of its diverse collection and in interdisciplinary ways, providing visitors with a more welcoming and comfortable experience, and better connecting the Museum to the urban fabric of midtown Manhattan.

WEST END EXPANSION

The western portion of the Museum is dedicated almost entirely to the display of art, featuring a stack of vertically interlocking galleries of varying heights. It includes street-level galleries comprised of a dedicated Projects Room and a gallery for contemporary design, a fully customized studio space for media, performance, and film, and a sixth-floor lounge with an outdoor terrace facing 53rd Street.

A custom entry canopy welcomes visitors into a double height space from 53rd street with an uninterrupted view between 53rd and 54th street, liberated by re-configuring ticketing and coat check off this central axis. The open lobby is equipped to host installations of art, on a ground floor free and open to all.

The Flagship Museum Store was lowered one level, making it a double-height space that allows for the reconfigured lobby to be visually connected to the street and directly woven into the fabric of midtown Manhattan. Museum visitors can look down into the store from the Night Entry, West Connector Lounge, and Blade Stair. There is a dedicated street entrance, bridge, glass elevator and stair enabling shoppers to bypass museum patrons if desired.

The blade stair marks the threshold to the new expansion of the museum and acts as a palette cleanser. The stair is a vibrant urban sculpture, combining a monumental physical presence with intangible structural lightness. This stair’s minimal expression was achieved through a number of structural innovations – a six-inch thin vertical spine hangs from the roof structure to support the stairs and landings, leaving them free of any lateral bracing. Glass balustrades on the seven-foot wide risers are cantilevered and held in place with pins to express the intersection of the two materials, a detail and dimension that echoes the renovated Bauhaus stair where the stair is embedded into the terrazzo.

The overall expansion yields a net increase in MoMA’s gallery space of one third, to approximately 165,000 square feet, allowing the Museum to exhibit significantly more art in new and interdisciplinary ways. The expansion to the west end of the site features a stack of vertically interlocking galleries of varying heights, enabling MoMA to realize a long-held aspiration: to present significantly more of its collection through a series of fluid, interconnected narratives of modern and contemporary art across all mediums. The expansion engages new street-level galleries comprised of a dedicated Projects Gallery and a gallery for contemporary design, which will be free and open to all, a new fully customized studio space for media, performance, and film, and a sixth-floor lounge with an outdoor terrace facing 53rd Street.

EAST END RENOVATION

The completed renovation of the east end includes the reconfiguration of 15,000 square feet to create two spacious galleries on the third floor that allow more flexibility for installing the collection and special exhibitions; the extension of the historic Bauhaus stair to the ground level to restore and enhance access to the second and third-floor galleries; and the addition of a new first-floor lounge facing the Abby Aldrich Rockefeller Sculpture Garden. On the second floor, a new lounge and an espresso bar overlook the Sculpture Garden. The design optimizes current spaces to be more flexible and technologically sophisticated, and creates more areas for visitors to pause and reflect. It enlarges and opens up the main lobby into a light-filled, double-height space and creates intuitive circulation routes through the Museum, including a connector that seamlessly links the new galleries to the renovated east side of the building.

Elizabeth Diller, co-founding partner of Diller Scofidio + Renfro, said, “This project has called on us to work across MoMA’s rich architectural history, incorporating the Museum’s existing building blocks into a comprehensible whole through careful and deliberate interventions into previous logics, as well as the construction of new logics that arise from MoMA’s current aspirations. This work has required the curiosity of an archeologist and the skill of a surgeon. The improvements will make the visitor experience more intuitive and will relieve congestion, while a new circulation network will knit together the expansion spaces with the lobbies, the theaters, and the Sculpture Garden to create a contiguous, free public realm that bridges street to street and art to city. The design integrates the various facets of the Museum’s architectural history, creating a distinct clear-glass façade on 53rd Street that complements the existing Goodwin and Stone, Johnson, and Taniguchi buildings and invites a more open dialogue between interior and exterior spaces.”

The MoMA Renovation & Expansion is LEED Platinum certified.

Project information

Location
Museum of Modern Art, New York, NY, United States
Groundbreaking
February 2016
Completed
2019
Opening
10/21/2019
DS+R role
Design Architect in collaboration with Gensler
Program
Art Studio, Auditorium, Cafe Restaurant, Espresso Bar, Exhibition Gallery, Gift Shop, Lounge, Office
Keywords
Adaptive Reuse, Archive, Campus, Circulation, Concrete, Culture, Curatorial Editorial, Display, Fashion, Fine Art, Glass, Interdisciplinary, Media, Metal, Museum, Photography, Programming, Public, Realized, Research, Site Specific, Social, Surgical, Sustainability, Urban, White Wall
Fun fact
50,000 SF of new gallery space
Credits
Partners Elizabeth Diller, Charles Renfro, Ricardo Scofidio, and Benjamin Gilmartin
Project Leaders Alberto Cavallero, Zoë Small, Kevin Rice, and Chris Andreacola
Designers Andrea Schelly, Chris Kupski, Daniel Markiewicz, Mario Bastianelli, Fareez Giga, Jess Austin, Michael Hundsnurscher, Jonathan Parker, Sean Rowe, Lilian Fitch, David Mayner, Heng-Choong Leong, Charles Blanchard, Sanny Ng, Derrick Benson, Ben Johnson, Roy Peer, Jason Buccheit, Chris Hall, Amber Foo, Jack Solomon, Andreas Kostopoulos, Michael Robitz, Barry Beagen, and Alice Colverd
External credits
Jean Savitsky Director, Real Estate Expansion, MoMA
Turner Construction Company Construction Manager
Lumsden Design Retail Consultant
Tillotson Design Associates Lighting Designer - Public Spaces
Renfro Design Group Lighting Designer - Gallery Spaces
Jaros Baum & Bolles (JB&B) MEP/FP/IT
Severud Associates Structural
Heintges Consulting Architects & Engineers P.C. Façade
Atelier Ten Sustainability
DVS Security Security
Cerami Associates Acoustics/Audio-Visual
Van Deusen Associates (VDA) Vertical Transportation
Fisher Dachs Associates (FDA) Theater Planning & Design
Boyce Nemec Designs Theater Audiovisual
Vidaris Waterproofing
Cini-Little International, Inc Foodservice
Gensler/Wkshps Signage/Wayfinding
Dante Tisi, DAMTSA Steel Fabricator—Blade Stair
M Cohen Steel Fabricator—Retail Stair, Counters
Frener+Reifer, Germany Steel Fabricator—Canopy
MillerBlaker Millwork

Press

Show 51 more articles